02 Mar 2003
Mechanical Contractor     Airmaster Completion Date September 2016 Airdivision undertook the duct installation component on the air handling unit upgrade at London House in the Perth CBD. Our role consisted of the removal and recycling of all light troffers on six floors, replacing them with swirl diffusers and adjusting the exisiting ceiling to suit.  We [...]
02 Mar 2002
Mechanical Contractor     West Australian Mechanical Services Builder  Pindan Completion Date Due for completion August 2017 The new Wanneroo Civic Centre will be a building with a roof terrace and basement.   The mechanical installation includes 3 plantrooms, variable air volume systems, and air diffusion incorporated into timber - feature ceilings and continuous perimetre linear [...]
30 Jun 2001
Mechanical Contractor     Admiral Mechanical Services Builder EMCO Building Completion Date June 2016 All Saints College new Year 5 & 6 Educational facility was Airdivision’s first major installation contract.  The building spans over three stories’ and was built to a extremely high grade finish.  The duct installation formed part of nine large Direct Expansion systems [...]
07 Mar 2000
Mechanical Contractor     B&E Fire Protection and Mechanical Services Completion Date February 2017 Zahra on Angove is a brand new development in the prestigious & coveted Harbour Rise Estate. The project consisted of 18 luxury apartments and 2 commercial tenancies.  The installation included a large carpark exhaust system, kitchen and toilet exhaust systems in [...]
05 Mar 1996
Mechanical Contractor     B&E Fire Protection and Mechanical Services Builder Alita Constructions Completion Date November 2016 The Samoan Church project, located in Baldivis, comprised of a large church with a 480 seat capacity auditorium, multi-purpose hall and a 7 bedroom residence. The Church air-conditioning system consisted of a Mezzanine plantroom with high level supply air [...]
22 Apr 1995
Mechanical Contractor     Airmaster Completion Date April 2017 This project included the replacement of 13 package units and ductwork.  Careful planning and coordination was required to complete this project in two stages within a small time frame.  A specialised helicopter was used in the installation due to the technically challenging location and unavailability to [...]
27 Feb 1994
Mechanical Contractor     B&E Fire Protection and Mechanical Services Completion Date January 2016 Ultra cool design co-working space and Dr Clause Cafe in Perth.  This project featured exposed supply and exhaust air duct and a large kitchen exhaust system.